Wednesday, April 8, 2009

Stage-2 Construction







Building the cockpit was the most critical due to the forming of curve sections and twisted
panels. Cutiing EPP need to use new blades and eventually the blades will become blunt easily,
so get ready more stocks. Carbon rods was needed on the main wing and tail wing to strengthen
the whole structure.
Two units of ED-64 was mounted on the tail using hot-glue and lock on to the fuselage.Make sure to align the EDF identical to get maximum thrust in-line.
Using recycle plastic bottle to get the half round covering the EDF to get a more realistic look.





No comments:

Post a Comment